# L-03 Decommissioning checklist

> Template v1, created by Agena Bio. Not a manufacturer document. It contains no acceptance criteria or procedures. Take values from your current manufacturer documents and your own validation. General guidance, not regulatory advice.
>
> Free to use inside your own organization; redistribution not permitted.

A checklist for taking an instrument out of service, with its records.

| Version | Date | Change |
| --- | --- | --- |
| 1 | 2026-11-24 | First release |

## Retirement

- Request reference: ______________________________
- Units: ______________________________
- Location: ______________________________
- Planned dates: ______________________________

## Plan

- [ ] Scope and decision owner recorded. Which units, which location, who signs the retirement.
- [ ] Warranty, service-plan and lease positions checked. Read your own agreements. Removal by others can be a coverage exclusion.

## Before removal

- [ ] Decontamination declaration signed and attached
- [ ] Data and configuration backup made, and the retention decision recorded. Retention is your laboratory's policy, not ours.
- [ ] Software and license questions put to the manufacturer in writing
- [ ] Reagents, chips, waste and biological material removed under your biosafety rules

## Removal

- [ ] Customer representative named for the de-installation
- [ ] De-installation carried out by a qualified engineer
- [ ] Transport coordinated and recorded

## After removal

- [ ] Disposal or onward route decided and recorded by the owner of the unit. We issue no disposal paperwork unless the business states that it does.
- [ ] Final service report, asset register and qualification records filed under your retention policy
- [ ] Anyone who must be told (plan holder, insurer, regulator) has been told

## Sign-off

- Name: ______________________________
- Role: ______________________________
- Signature: ______________________________
- Date: ______________________________

## Biohazard refusal and hold point

We do not accept for service any instrument or part that has been exposed to BSL-3 or BSL-4 agents or to radioactive material. Before any visit or return we require a signed decontamination declaration from the customer. When the unit arrives or the engineer attends, the engineer checks the declaration against the visible condition of the unit. If they disagree, or the status is unclear, work stops, the unit is not handled further, and the matter goes to the customer's biosafety officer. An engineer may refuse or stop work on any unit at any time for safety reasons.
