L-01 Move checklist
Template v1, created by Agena Bio. Not a manufacturer document. It contains no acceptance criteria or procedures. Take values from your current manufacturer documents and your own validation. General guidance, not regulatory advice.
A checklist for moving an instrument across a lab, a building or a country.
Move
- Request reference:
- From:
- To:
- Planned dates:
Plan
- Scope agreed: what moves, from where, to where, and who decides. Include the chip-prep unit, any stand-alone dispenser and the instrument PC if they move too.
- Warranty and service-plan status checked and recorded. Read your own agreement. A move by others can be a coverage exclusion.
- Documents you hold lawfully gathered and listed
- Destination room completed the site-readiness checklist. Use the site-readiness sheet for the new room.
Before the move
- Decontamination declaration signed and attached. Signed by the customer before any visit. The engineer checks it against the visible condition of the unit.
- Data and configuration backup made and checked. Use the backup list in your manufacturer's guide.
- Reagents, chips and biological material handled separately. None of these travel with the instrument.
- Customer representative named for de-installation and re-installation
The move
- De-installation carried out by a qualified engineer. Record the date, the engineer and any condition noted on the unit.
- Packing as specified by the engineer. Photograph the packed unit and keep the photographs with the record.
- Insured transport booked, carrier and route recorded
After the move
- Re-installation carried out by a qualified engineer
- Re-qualification scope decided under your change control. See the installation and qualification page for the pattern other instrument makers publish.
- Records updated: location, asset register, service report filed
Sign-off
- Name:
- Role:
- Signature:
- Date: