# L-01 Move checklist

> Template v1, created by Agena Bio. Not a manufacturer document. It contains no acceptance criteria or procedures. Take values from your current manufacturer documents and your own validation. General guidance, not regulatory advice.
>
> Free to use inside your own organization; redistribution not permitted.

A checklist for moving an instrument across a lab, a building or a country.

| Version | Date | Change |
| --- | --- | --- |
| 1 | 2026-11-24 | First release |

## Move

- Request reference: ______________________________
- From: ______________________________
- To: ______________________________
- Planned dates: ______________________________

## Plan

- [ ] Scope agreed: what moves, from where, to where, and who decides. Include the chip-prep unit, any stand-alone dispenser and the instrument PC if they move too.
- [ ] Warranty and service-plan status checked and recorded. Read your own agreement. A move by others can be a coverage exclusion.
- [ ] Documents you hold lawfully gathered and listed
- [ ] Destination room completed the site-readiness checklist. Use the site-readiness sheet for the new room.

## Before the move

- [ ] Decontamination declaration signed and attached. Signed by the customer before any visit. The engineer checks it against the visible condition of the unit.
- [ ] Data and configuration backup made and checked. Use the backup list in your manufacturer's guide.
- [ ] Reagents, chips and biological material handled separately. None of these travel with the instrument.
- [ ] Customer representative named for de-installation and re-installation

## The move

- [ ] De-installation carried out by a qualified engineer. Record the date, the engineer and any condition noted on the unit.
- [ ] Packing as specified by the engineer. Photograph the packed unit and keep the photographs with the record.
- [ ] Insured transport booked, carrier and route recorded

## After the move

- [ ] Re-installation carried out by a qualified engineer
- [ ] Re-qualification scope decided under your change control. See the installation and qualification page for the pattern other instrument makers publish.
- [ ] Records updated: location, asset register, service report filed

## Sign-off

- Name: ______________________________
- Role: ______________________________
- Signature: ______________________________
- Date: ______________________________
