T-09 Site-readiness sheet
Template v1, created by Agena Bio. Not a manufacturer document. It contains no acceptance criteria or procedures. Take values from your current manufacturer documents and your own validation. General guidance, not regulatory advice.
A sheet to record the readiness of a room against your manufacturer's site-preparation document, including what to record about electrical supply quality.
Version
| Version | Date | Change |
|---|---|---|
| 1 | 2026-11-24 | First release. |
Room and instrument
- Site and room
- Instrument model name as printed on the unit
- Planned delivery date
- Completed by
- Date
Readiness areas
| Area | Requirement as written in your manufacturer's document | Status (met, not met, n/a) | Evidence | Owner | Date |
|---|---|---|---|---|---|
| Access route and doors | |||||
| Lifting and handling | |||||
| Bench or floor support | |||||
| Electrical supply and protection | |||||
| Network and PC | |||||
| Ambient conditions | |||||
| Vibration and dust | |||||
| Exhaust and ventilation as specified in the manufacturer's site-preparation document | |||||
| Waste handling | |||||
| Kit storage | |||||
| Contamination-control zones | |||||
| Safety signage | |||||
| Engineer access | |||||
| Decontamination status | |||||
| Documentation held |
Power quality: what to record
- Outages noticed in the room (dates)
- Sags, surges or flicker noticed (dates)
- Supply and earthing evidence from your electrician or facilities team (document reference)
- Existing protection on the circuit (description)
Questions to put to the manufacturer, in writing
- What supply does the instrument need, and where is that written?
- What protection and earthing does it need?
- Is a UPS or surge protection advised for the instrument, and how?
- Is a UPS or surge protection advised for the PC, and how?
- Reference and date of the written reply
Sign-off
| Role | Name | Signature | Date |
|---|---|---|---|
| Completed by | |||
| Facilities or electrical contact | |||
| Laboratory director or delegate |
Where the structure comes from
- We could not find a public site-preparation guide in the pages we checked, so every requirement here is entered by you from your own document. (source INS-01)
- Published guidance describes unidirectional workflow and separated areas for molecular work. (source LAB-19)
- The layout and prompts are original. No manufacturer document, SOP or form was copied.
License and file check
Take values from your manufacturer documents and your own validation.
Free to use inside your own organization; redistribution not permitted.