# T-09 Site-readiness sheet

> Template v1, created by Agena Bio. Not a manufacturer document. It contains no acceptance criteria or procedures. Take values from your current manufacturer documents and your own validation. General guidance, not regulatory advice.

A sheet to record the readiness of a room against your manufacturer's site-preparation document, including what to record about electrical supply quality.

Topic: Service and installation.

## Version

| Version | Date | Change |
| --- | --- | --- |
| 1 | 2026-11-24 | First release. |

## Room and instrument

- Site and room: ____________________
- Instrument model name as printed on the unit: ____________________
- Planned delivery date: ____________________
- Completed by: ____________________
- Date: ____________________

## Readiness areas

Enter each requirement as written in your manufacturer's document. This template contains no values.

| Area | Requirement as written in your manufacturer's document | Status (met, not met, n/a) | Evidence | Owner | Date |
| --- | --- | --- | --- | --- | --- |
| Access route and doors |   |   |   |   |   |
| Lifting and handling |   |   |   |   |   |
| Bench or floor support |   |   |   |   |   |
| Electrical supply and protection |   |   |   |   |   |
| Network and PC |   |   |   |   |   |
| Ambient conditions |   |   |   |   |   |
| Vibration and dust |   |   |   |   |   |
| Exhaust and ventilation as specified in the manufacturer's site-preparation document |   |   |   |   |   |
| Waste handling |   |   |   |   |   |
| Kit storage |   |   |   |   |   |
| Contamination-control zones |   |   |   |   |   |
| Safety signage |   |   |   |   |   |
| Engineer access |   |   |   |   |   |
| Decontamination status |   |   |   |   |   |
| Documentation held |   |   |   |   |   |

## Power quality: what to record

Record facts. This sheet does not give supply requirements.

- Outages noticed in the room (dates): ____________________
- Sags, surges or flicker noticed (dates): ____________________
- Supply and earthing evidence from your electrician or facilities team (document reference): ____________________
- Existing protection on the circuit (description): ____________________

## Questions to put to the manufacturer, in writing

- [ ] What supply does the instrument need, and where is that written?
- [ ] What protection and earthing does it need?
- [ ] Is a UPS or surge protection advised for the instrument, and how?
- [ ] Is a UPS or surge protection advised for the PC, and how?
- [ ] Reference and date of the written reply

## Sign-off

| Role | Name | Signature | Date |
| --- | --- | --- | --- |
| Completed by |   |   |   |
| Facilities or electrical contact |   |   |   |
| Laboratory director or delegate |   |   |   |

---

Take values from your manufacturer documents and your own validation.

Free to use inside your own organization; redistribution not permitted.