| 01 | Purpose | One short paragraph on why the procedure exists and what it controls. | State what this procedure does, for which assay, in which laboratory. |
|---|
| 02 | Scope | What is covered and what is not: instruments, assays, specimen types, plate formats, sites. | List the instruments, assay content, specimen types and plate formats covered, and what is excluded. |
|---|
| 03 | Responsibilities and competency | Roles, who may perform each task, and where training and competency are recorded. | Name each role, what it is responsible for, and the training record that shows competency. |
|---|
| 04 | Definitions | Terms and abbreviations used in this document, written once. | Define each term and abbreviation the way your laboratory uses it. |
|---|
| 05 | Safety, waste and spills | Pointers to your biosafety rules and the safety data sheets. Work inside an instrument is engineer-only. | Refer to your site biosafety procedure and safety data sheets. State that covers stay closed and who to call. |
|---|
| 06 | Sample and DNA acceptance as defined by the laboratory | What the laboratory accepts, how quality and quantity are judged, and what happens to a rejected sample. | Write the acceptance rules your laboratory has set, how each is measured, and the route for rejection or recollection. |
|---|
| 07 | Equipment and software | Instrument identifiers, software names and versions as installed, and where maintenance and calibration status is recorded. | List each instrument and software item with its identifier and version, and the record that shows its status. |
|---|
| 08 | Reagents and consumables | Items, suppliers, storage as the supplier's insert states, lot and expiry recording, receiving checks. | List each item, the storage condition from the insert, and how lot and expiry are recorded and checked. |
|---|
| 09 | Facility layout and contamination control | Areas, one-way flow, and what the laboratory does to keep amplified material away from set-up areas. | Describe the areas and the direction of work, and refer to the cleaning and monitoring records. |
|---|
| 10 | Pre-run checks | What must be true before a run starts: instrument ready, consumables on hand, maintenance current, controls prepared. | List each check, who does it, and where it is recorded. |
|---|
| 11 | Procedure by stage | One subsection per stage. Each opens with a reference to the current manufacturer's instructions, by document and version. | For each stage write: 'Refer to the current manufacturer's instructions', the document reference, and any local variation with its validation reference. |
|---|
| 12 | Controls and acceptance criteria | Which controls run on each plate, where the acceptance criteria are written, and what happens when one is not met. | Name the controls, point to the document where criteria are set by the laboratory director, and state the action when a criterion is not met. |
|---|
| 13 | Data review and interpretation | Who reviews, what is reviewed, how manual review of plots and spectra is recorded, and how exclusions are decided. | State who reviews, what second review covers, and where exclusions and manual calls are recorded. |
|---|
| 14 | Review and disposition of results under the laboratory's own regulatory framework | How a result is reviewed, held, repeated or passed on, in the terms your own framework uses. | Describe review and disposition of results as your regulatory framework and your director require. This outline sets nothing here. |
|---|
| 15 | Troubleshooting and escalation | A pointer to the maintenance and troubleshooting procedure and the escalation route. | Refer to the troubleshooting procedure and name who is called and when. |
|---|
| 16 | Maintenance and calibration cross-references | Where the maintenance log, calibration records and service reports live. | List the records and their locations. Do not copy intervals into this document. |
|---|
| 17 | Records, retention and backup | What is kept, where, for how long under your policy, and how backups are made and checked. | List each record type, its location, your retention rule and the backup arrangement. |
|---|
| 18 | Validation summary and change control | A pointer to the validation report and the change-control procedure. | Refer to the validation summary, and state which changes trigger a change record. |
|---|
| 19 | References | Documents this procedure depends on, each with version. | List manufacturer documents, standards and internal procedures with their versions. |
|---|
| 20 | Appendices | Plate map, run record, review checklist, reagent and lot log, deviation form. | Attach or reference each form used with this procedure. |
|---|
| 21 | Revision history | Version, date, what changed, who made and reviewed the change. | Record every revision. |
|---|