Repair and installation
Plan a move from the first call to re-qualification, with a staged timeline, a date planner and a checklist you can export.
The site-readiness checklist, the power-quality note and installation and qualification are on Site readiness and installation.
Plan a move: who does what, the records to keep, and the checks that follow, with a move checklist you can export.
Three things, in this order, before anyone touches the instrument.
Eight stages, with no durations asserted. Your engineer and your carrier set the dates.
Other instrument makers describe a move as a staged, insured job led by engineers: a consultation before the move, insured transport, de-installation and re-installation by engineers, then testing[4]. One of those descriptions is silent on decontamination, so we add a signed declaration as stage two.
De-installation and re-installation are for a qualified service engineer only: instruments contain a laser, high-voltage electronics and a vacuum system. Your own team never opens covers or disconnects internal parts to prepare a move.
After the move, which records are repeated is for your change control to decide. A pattern from another vendor; your SOP and the manufacturer's documents decide IQ is repeated after relocation and re-installation in that pattern[5]. See the full pattern.
Enter the date for each stage. The planner checks that they run in order and prints the plan.
The planner checks only that dates run in order. It does not suggest dates or durations; those come from your engineer and your carrier.
0 of 14 lines have a status0 met0 not met
Scope agreed: what moves, from where, to where, and who decides
Include the chip-prep unit, any stand-alone dispenser and the instrument PC if they move too.
Warranty and service-plan status checked and recorded
Read your own agreement. A move by others can be a coverage exclusion.
Documents you hold lawfully gathered and listed
Destination room completed the site-readiness checklist
Use the site-readiness sheet for the new room.
Decontamination declaration signed and attached
Signed by the customer before any visit. The engineer checks it against the visible condition of the unit.
Data and configuration backup made and checked
Use the backup list in your manufacturer's guide.
Reagents, chips and biological material handled separately
None of these travel with the instrument.
Customer representative named for de-installation and re-installation
De-installation carried out by a qualified engineer
Record the date, the engineer and any condition noted on the unit.
Packing as specified by the engineer
Photograph the packed unit and keep the photographs with the record.
Insured transport booked, carrier and route recorded
Re-installation carried out by a qualified engineer
Re-qualification scope decided under your change control
See the installation and qualification page for the pattern other instrument makers publish.
Records updated: location, asset register, service report filed
SHA-256 f9584f20a35d…
Free to use inside your own organization; redistribution not permitted.
A move between countries adds customs, transport and local regulatory questions that we cannot answer from a desk. Ask us early so the engineer, the carrier and your biosafety officer can agree the paperwork together.
Regions covered for moves: United States, Germany
The manufacturer’s warranty excludes relocation by others, while another vendor describes relocation as a staged, insured, engineer-led job followed by testing and re-qualification[2]. Plan for both.
Planning and support for moving an instrument, with checks recorded before and after the move.
We work only from protocols and documents the customer supplies and holds lawfully; we do not supply manufacturer protocols.
Regions: United States, Germany Lead time: Confirmed at triage.
Describe the move: what, where from, where to, and when. Leave out patient and sample data. Request service
Continues on Buy used or retire an instrument: the pre-purchase checklist for a second-hand unit and the decommissioning checklist.
Covers stay closed. Work inside an instrument is for a qualified service engineer only. Safety statement
Research-use context. No diagnostic or clinical claims. Read the research-use notice
Describe the instrument and what you need. Leave out patient and sample data.
[1]
WAR-02
The warranty page excludes a system that is repaired, modified, altered, assembled, disassembled or moved from its original installation location by anyone other than Agena or a service provider the page leaves undefined. It is a coverage exclusion, so customers should check their own agreement.
Agena Bioscience: System Warranty, agenabio.com/support/system-warranty/
Checked on 24 November 2026Manufacturer-reported
[2]
INS-03
Agena's warranty excludes relocation by others from coverage, while another vendor describes relocation as a staged, insured, engineer-led job followed by testing and re-qualification (see LAB-17 and LAB-18).
Agena Bioscience: System Warranty; How easy is it to relocate a mass spectrometer? (vendor community blog, 1 June 2017), agenabio.com/support/system-warranty/
Checked on 24 November 2026Derivedmedium confidence
[3]
WAR-05
Before a service visit the customer must tell Agena in writing about any decontamination of the system, a customer representative must be on site throughout on-site service, and no product or component may be returned without Agena's prior consent.
Agena Bioscience: System Warranty, agenabio.com/support/system-warranty/
Checked on 24 November 2026Manufacturer-reportedmedium confidence
[4]
LAB-18
Relocation and return patterns at other instrument companies: one describes relocation in four stages (pre-move consultation, insured transport, de-installation and re-installation by engineers, testing and calibration) and is silent on decontamination; another requires a decontamination declaration form with some returns, a reference number, item condition and a detailed fault description.
How easy is it to relocate a mass spectrometer? (vendor community blog, 1 June 2017); goods-return page (another instrument vendor), Other-vendor public page
Checked on 24 November 2026Third partymedium confidence
[5]
LAB-17
Another instrument vendor's public qualification pattern: IQ confirms installation to specification and safety rules, OQ confirms operation within operating specifications, and PQ follows a qualified major repair. IQ is repeated at install, after relocation and reinstallation and after environment change; OQ after reactive service, software upgrade or preventive maintenance.
Instrument qualification services page (another instrument vendor), Other-vendor public page
Checked on 24 November 2026Third partymedium confidence