Home

Independent instrument service for MassARRAY systems

A white and blue instrument on a plain dark grey studio surface.

Validation and SOPs

Validation

General guidance on instrument qualification, performance verification and proficiency testing, under your laboratory's own regulatory framework.

Checked on 24 November 2026
On this page

Start here

General guidance for laboratories on qualification, performance verification and assay validation under their own regulatory framework.

Three words, three jobs

Qualification, verification and validation are often used as if they meant one thing. They answer different questions and belong to different people.

Mixing them up is expensive. A laboratory that treats a clean installation record as proof that an assay works has skipped the question that matters most. A laboratory that repeats a full assay study after every service visit has probably spent time on the wrong layer.

The pages below take each layer in turn, give you blank worksheets to fill with your own numbers, and say plainly where a service provider can help and where it cannot.

Each laboratory validates under its own regulatory framework. See Regulatory context for a dated summary.

Three layers of assuranceThree stacked bands. At the bottom, instrument qualification asks whether the instrument is installed and operates as documented. In the middle, performance verification asks whether it still behaves as before. At the top, assay validation asks whether the assay meets the performance the laboratory set.Assay validationDoes the assay, as you run it,meet the performance you set?Owner: the laboratory directorPerformance verificationDoes the instrument still behaveas it did, run after run?Repeated at a frequency you setInstrument qualificationIs it installed and operatingas its documents describe?Owner: the laboratory, from documents
Text version: assay validation sits on performance verification, which sits on instrument qualification. Each layer has its own owner and its own evidence.
Qualification, verification and validation compared
TermThe question it answersWho owns itTypical evidenceWhere a service provider fits
Instrument qualificationIs the instrument installed as specified, and does it operate as specified? It is usually documented in stages: design, installation, operation and performance.[1]The laboratory, working from the manufacturer's documents for the instrument.Installation, operation and performance records, and an index that finds them.A provider can execute and document tasks against your protocol.
Performance verificationDoes the instrument still behave as it did when it was qualified?The laboratory, which chooses the material, the frequency and the limits.Dated run records and a trend over time.A provider can run and record a check after service. It sets no limits.
Assay validationDoes the assay, as you run it, perform well enough for the purpose you set? Rules differ by test type: one framework separates verifying an unmodified, cleared test from establishing the performance specifications of a modified test or one not subject to clearance.[2]The laboratory director.A plan, study data, a summary report and a sign-off.None. Acceptance criteria are never ours to set.
Close view of a brushed metal sample plate with a grid of small wells, a few glowing amber.

Which one do you need?

Three questions. The answer is an explanation and a place to read next, not a verdict.

1. What are you trying to show?
2. What has happened?
3. Where do your acceptance criteria come from today?
Explanation, not a verdict

Answer the three questions and a short explanation appears here.

In this section

What a service provider does and does not do here

We execute and document qualification tasks against your protocol, or against documents you supply. We do not set acceptance criteria, and we do not declare an instrument validated or fit for clinical use.

See the installation and qualification process

Instrument qualification

The usual stages of instrument qualification and the records each leaves behind, to be adapted to your protocol.

Four stages, each with a record

Qualification asks whether an instrument is fit for the job you gave it, and keeps the evidence.

Design qualification (DQ) records what you need the instrument to do and why this model suits it. It happens before purchase or before you accept a used unit.

Installation qualification (IQ) and operational qualification (OQ) are described in one vendor’s public pattern this way: IQ confirms installation to specification and safety rules, and OQ confirms operation within operating specifications.[3] A pattern from another vendor; your SOP and the manufacturer's documents decide

Performance qualification (PQ) shows that the instrument performs for your use, under your conditions, with your material. It is where instrument qualification meets assay validation.

The four-stage framing is common in pharmacopoeial guidance, which also groups instruments by how much qualification they need.[1] Which group an instrument falls in is for your quality system to decide.

Four qualification stagesFour steps in order: design qualification, installation qualification, operational qualification and performance qualification, each with the record it leaves behind.DQDesignIs this model fit for theuse you intend?Record: your requirementsIQInstallationInstalled as specified,to safety rules.Record: installation recordOQOperationOperates within its operatingspecifications.Record: operating checksPQPerformancePerforms for your use, underyour conditions.Record: your runs and review
Text version: design, installation, operation and performance qualification, in that order. Each stage leaves a record: your requirements, an installation record, operating checks, and your runs and review.

The stage skeleton

One row per stage, with the columns an auditor will look for. Add rows for sub-tests. Acceptance criteria stay blank until you copy them from your documents.

Qualification stage skeleton
StageWhat to documentSource of requirementMethodAcceptance criterion (from the manufacturer's document or set by the laboratory)Evidence fileDate and signerStatusRow actions

Your entries are kept in this browser only. Nothing is sent to us.

After a change, what usually repeats?

Qualification is not a one-off. A change to the instrument, its place or its software raises the question of what to repeat.

Event selectora pattern from another vendor

Choose an event to see which stages the pattern repeats.

A pattern from another vendor; your SOP and the manufacturer’s documents decide. This is not a requirement and not advice for your instrument.

The table is one vendor’s published pattern: installation qualification is repeated at installation, after relocation and reinstallation and after an environment change; operational qualification after reactive service, a software upgrade or preventive maintenance; performance qualification after a qualified major repair.[3]

A pattern from another vendor; your SOP and the manufacturer's documents decide. It is a starting point for your own decision, written into your own change-control record. Change control shows how.

Stages repeated after each event, in another vendor's public pattern
EventInstallation qualificationOperational qualificationPerformance qualification
New installationRepeated in the patternNot listedNot listed
Relocation and reinstallationRepeated in the patternNot listedNot listed
Change to the environmentRepeated in the patternNot listedNot listed
Service after a fault (reactive service)Not listedRepeated in the patternNot listed
Software upgradeNot listedRepeated in the patternNot listed
Preventive maintenanceNot listedRepeated in the patternNot listed
Major repairNot listedRepeated in the patternRepeated in the pattern

What the manufacturer says in public

The manufacturer’s service-plan page names qualification services and monthly performance-verification kits in its higher tier, and defines neither.[6] The same page links a brochure titled Performance Verification Kit. We have not read its contents, so we say nothing about what it holds.[7]

We could not find a pre-installation guide, an installation checklist or an IQ and OQ protocol in the public pages we checked on 24 November 2026.[8] Ask the manufacturer for its current qualification documents, and take every limit from them.

We do not reproduce manufacturer manuals, procedures or error codes. Ask the manufacturer or use your customer portal.

What a service provider does in qualification

We execute and document qualification tasks against your protocol, or against documents you supply. We do not set acceptance criteria and we do not declare an instrument validated or fit for clinical use.

Some tasks are done inside the instrument. Those are for a qualified service engineer only.

Covers stay closed. Work inside an instrument is for a qualified service engineer only. Safety statement

A service report records what was done and measured. It is not a declaration that an instrument is validated or fit for clinical use.

After a repair

Another vendor lists operational qualification after reactive service and preventive maintenance, and performance qualification after a qualified major repair. The manufacturer’s plan names qualification services without defining them.[4] Whatever you decide, write it down before the visit, so the engineer knows which checks the report must record.

The service report records what was run and what was measured. You compare it with your own criteria and you decide whether the instrument returns to use.

Records and retention

How long you keep qualification records is your policy. What to keep is simpler to list:

  • The protocol and its version, with the manufacturer documents it points to.
  • Raw results and any deviation, with who recorded it and when.
  • Instrument and software identifiers as they were at the time.
  • Signatures and dates for each stage.
  • An evidence index, so a reviewer can find each item.

T-10 Qualification evidence index, T-04 Installation checklist and T-11 Service report are blank forms for this.

Performance verification

How to plan and record performance verification runs against acceptance criteria that your laboratory sets.

Is the instrument healthy? Write the answer down.

Performance verification is a short, repeated run that shows the instrument still behaves the way it did when you qualified it.

A single good run proves little. A series of runs, plotted in order, shows drift while it is still small: a metric creeping toward a limit, a step change after a service visit, a slow decline. That is the point of doing it on a schedule.

Your laboratory chooses the material, the metric, the frequency and the limits, and writes them in its SOP. This page gives you the structure and a place to plot your own numbers. It does not supply limits, because any default would be a guess about your instrument.

What a verification run records

Enough that someone else can repeat it and read the result a year later.

  • Instrument and software identifiers, as they were that day.
  • The date, and who ran it.
  • The material used, where it came from and its lot.
  • The metrics your SOP defines, with the values observed.
  • The limits in force, so a later change to the limits is visible.
  • Who reviewed the result, and when.

When it is run

Periodically, at the interval your SOP sets. After service, because another vendor’s public pattern repeats operational qualification after reactive service, preventive maintenance and software upgrades, and a verification run is one way to carry that out.[4] After a relocation, for the same reason.

One example framework requires a laboratory to perform and document the manufacturer’s maintenance and function checks at least as often as the manufacturer specifies, with results within the manufacturer’s limits before testing.[9] Where your framework says something similar, your SOP should say how the verification run satisfies it.

Plot your own values

Enter the metric, your limits and your results. The chart marks any result outside the limits you typed. It marks arithmetic only.

As your SOP defines it

If it has one

Leave blank until your SOP sets one

Leave blank until your SOP sets one

Run chartyour values, your limits

Enter results below. The chart appears when there is at least one numeric value.

Circle: within the limits you entered, or no limits entered. Diamond: outside them. The chart marks arithmetic only; what a point means is for your SOP.
Results in run order
DateResultAgainst your limitsNoteRow actions
No results yet. Choose “Add a result”.

Entries stay in this browser. Nothing is sent to us.

What the manufacturer says in public

The manufacturer’s service plans name monthly performance-verification kits in the higher tier and do not define them.[6] A linked brochure carries the title Performance Verification Kit; we have not read it.[7]

In the public pages we checked on 24 November 2026, the manufacturer does not list the contents, metrics or limits of a verification run. If you hold the material and the document, use them; they are the source for your limits. We publish no limits.

We do not reproduce manufacturer manuals, procedures or error codes. Ask the manufacturer or use your customer portal.

A record to keep

Related: instrument qualification, the preventive-maintenance log and change control.

Proficiency testing and external assessment

Why laboratories join external assessment schemes, and a log to record rounds, results and corrective actions.

Testing yourself against other laboratories

External assessment gives you a view of your own performance that your internal controls cannot.

A provider sends samples whose expected results it knows but you do not. You test them the way you test routine samples, report the results, and the provider compares them with the expected answer or with other participants. A good result is reassuring. A poor one is useful, because it shows a problem your internal controls missed.

A reference material is not a proficiency sample. You know its expected result in advance, so it cannot test whether your whole process, including interpretation, gets the right answer. Public reference-material programs, such as the GeT-RM list, are described on their own page.[5]

Where the requirement comes from

Not from this site.

Whether you must take part, how often, and in which scheme depends on your regulator, on the body that assesses your laboratory, or on a contract. This page names no scheme and sets no frequency, because any answer would be a guess about your situation.

Where no scheme covers an assay, laboratories commonly arrange an alternative, such as exchanging blinded samples with another laboratory. Whether that satisfies your assessor is your assessor’s call, so ask before you rely on it.

What to record for each event

  • The event or round, and the provider.
  • The date the samples arrived and the date you reported.
  • Each sample's identity in your own system, not the provider's code alone.
  • The expected result, when the provider gives it.
  • The result you reported.
  • The provider's evaluation of it.
  • Any corrective action, who owned it, and when it closed.
  • Who reviewed the whole event.

If a result is unsatisfactory, treat it as a change-control trigger and record what you investigated and what you changed. See change control.

Keep a log

Add one row per event. Export it, or print it for the file.

Proficiency-testing log
EventProviderDateSample identity in your systemExpected resultReported resultEvaluationCorrective actionReviewerClosed onRow actions

Your entries are kept in this browser only. Nothing is sent to us.

General information; not legal, regulatory or clinical advice.

Sources

  1. [1]
    LAB-16

    USP general chapter <1058> frames analytical instrument qualification as DQ, IQ, OQ and PQ, with instruments sorted into groups A, B and C; a draft revision renames it Analytical Instrument and System Qualification.

    An Enhanced Approach to Analytical Instrument and System Qualification (Spectroscopy, 1 May 2025), spectroscopyonline.com/an-enhanced-approach-to-analytical-instrument-and-system-qualification

    Checked on 24 November 2026Third partymedium confidence

  2. [2]
    LAB-04

    CLIA 42 CFR 493.1253: for an unmodified FDA-cleared test a laboratory verifies accuracy, precision and reportable range and confirms reference intervals; for modified tests and tests not subject to FDA clearance it also establishes analytical sensitivity and specificity (including interfering substances) and any other needed characteristic before reporting patient results.

    42 CFR 493.1253 Standard: Establishment and verification of performance specifications (eCFR) (external)

    Checked on 24 November 2026Regulator

  3. [3]
    LAB-17

    Another instrument vendor's public qualification pattern: IQ confirms installation to specification and safety rules, OQ confirms operation within operating specifications, and PQ follows a qualified major repair. IQ is repeated at install, after relocation and reinstallation and after environment change; OQ after reactive service, software upgrade or preventive maintenance.

    Instrument qualification services page (another instrument vendor), Other-vendor public page

    Checked on 24 November 2026Third partymedium confidence

  4. [4]
    DIA-06

    Qualification after service is a common pattern: another vendor lists operational qualification after reactive service or preventive maintenance and performance qualification after a qualified major repair, while Agena's Plus plan names monthly performance verification kits and qualification services without defining them.

    Instrument qualification services page (another instrument vendor); Agena Bioscience: Service Plans, Other-vendor public page

    Checked on 24 November 2026Derivedmedium confidence

  5. [5]
    LAB-14

    CDC's GeT-RM page (10 September 2024) lists consensus genotypes for 363 samples across 9 studies covering 34 genes or loci, plus a list of 546 hard-to-detect pathogenic variants in 84 genes; DNA comes from Coriell cell lines. Characterization studies covered 107 DNAs for five loci (2010), 137 DNAs across 28 pharmacogenetic genes (2016) and 179 DNAs focused on CYP2D6 (2019).

    CDC Genetic Testing Reference Material Coordination Program (GeT-RM): reference materials (external)

    Checked on 24 November 2026Regulator

  6. [6]
    SUP-01

    Agena's service-plan page lists an Essential tier (preventive maintenance, on-site applications support, fast response) and a Plus tier that adds applications training, monthly performance verification kits, next-day response and qualification services. Both cover the system and the Chip Prep Module; no prices, hours or definitions are given.

    Agena Bioscience: Service Plans, agenabio.com/support/service-plans/

    Checked on 24 November 2026Manufacturer-reportedmedium confidence

  7. [7]
    SUP-06

    Agena's service-plans page links three brochures titled Customer Support Solutions, Windows 10 upgrade and Performance Verification Kit. Their contents were not read, so only the titles can be cited.

    Agena Bioscience: Service Plans, agenabio.com/support/service-plans/

    Checked on 24 November 2026Manufacturer-reportedmedium confidence

  8. [8]
    INS-01

    We could not find a pre-installation guide, installation checklist, IQ/OQ protocol, service manual or parts list in the Agena support and resource pages we checked on 24 November 2026; what is there is warranty terms, two service plans and support routes. Physical and electrical figures for the Analyzer 4 appear only in third-party listings.

    Agena Bioscience: Support; Agena Bioscience: Product Literature, agenabio.com/support/

    Checked on 24 November 2026Derivedmedium confidence

  9. [9]
    LAB-06

    CLIA 42 CFR 493.1254: for unmodified manufacturer-supported equipment the laboratory performs and documents the manufacturer's maintenance and function checks at least as often as the manufacturer specifies, with results within the manufacturer's limits before patient testing; modified or non-manufacturer equipment needs the laboratory's own written protocols.

    42 CFR 493.1254 Standard: Maintenance and function checks (eCFR) (external)

    Checked on 24 November 2026Regulator