Home

Independent instrument service for MassARRAY systems

A clipboard holding a blank checklist, with a laboratory bench blurred behind it.

Validation and SOPs

Templates

Eighteen original, free templates as print-ready HTML, Markdown and CSV downloads. Not manufacturer documents; every value is left for your laboratory.

Checked on 24 November 2026
On this page

How the templates work

Eighteen blank forms and outlines for the paperwork around a MassARRAY laboratory. Each one is original structure written for this site.

Every template opens in a print-ready page, and downloads as Markdown. The ones built around a table also download as CSV, so you can open them in a spreadsheet. Use your browser’s print dialog and choose “Save as PDF” for a PDF.

None of them contains an acceptance limit, an interval, a procedure step or a value from a manufacturer document. Those columns are blank on purpose: you fill them from your own current documents and your own validation.

Each file carries a version table and a SHA-256 checksum, shown on its card, so a copy you hold can be matched to the page.

Covers stay closed. Work inside an instrument is for a qualified service engineer only. Safety statement

Where to start

We do not reproduce manufacturer manuals, procedures or error codes. Ask the manufacturer or use your customer portal.

Not sure where a fact came from? How we source content explains the markers, the dates and what we leave out.

All templates

Template v1, created by Agena Bio. Not a manufacturer document. It contains no acceptance criteria or procedures. Take values from your current manufacturer documents and your own validation. General guidance, not regulatory advice.

Take values from your manufacturer documents and your own validation.

Filter by topic

Showing 18 of 18 templates.

  • T-01v1checked 24 Nov 2026

    SOP template (assay procedure)

    SOPs and plansDocument-control block, the 21-section outline with a prompt for each, appendices, revision history and a signature page.
    What is inside: SOP template (assay procedure)

    An outline for an assay procedure. Every procedural stage points to your current manufacturer instructions rather than copying them, and no acceptance criterion is filled in.

    Sections

    1. Document control
    2. Sections
    3. Section 11: procedure by stage
    4. Appendices
    5. Revision history
    6. Sign-off

    Where the structure comes from

    • Document-control and document-management practice is covered by CLSI QMS02; qualitative multiplex assay verification by CLSI MM17.[1]
    • Section 9 leaves the separation of pre-amplification and post-amplification work for your laboratory to describe; published guidance exists.[2]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML10 KB for SOP template (assay procedure), opens in a new tab

    SHA-256 546d73c0c205…

    Free to use inside your own organization; redistribution not permitted.

  • T-02v1checked 24 Nov 2026

    Validation plan

    SOPs and plansThe twelve plan sections, qualification table, performance-characteristic tables with blank laboratory-set columns, and a sign-off page.
    What is inside: Validation plan

    A plan outline for an assay validation. It names the questions to answer and leaves every value for your laboratory to set before the study starts.

    Sections

    1. Plan control
    2. Plan sections
    3. Instrument qualification (DQ, IQ, OQ, PQ)
    4. Performance characteristics: qualitative germline genotyping
    5. Performance characteristics: quantitative somatic detection
    6. Reference materials
    7. Acceptance-criteria worksheet
    8. Ongoing QC and revalidation
    9. Sign-off
    10. Statement

    Where the structure comes from

    • Rules on establishing and verifying performance specifications differ by test type. One example of how a framework separates them is 42 CFR 493.1253.[3]
    • Guidance on validating qualitative multiplex assays for genotyping is published by CLSI as good-practice recommendations.[1]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML12 KB for Validation plan, opens in a new tab

    SHA-256 5388831bd1c5…

    Free to use inside your own organization; redistribution not permitted.

  • T-03v1checked 24 Nov 2026

    Run log

    Run and lot recordsOne sheet per plate or chip: instrument and reagent blocks, plate maps for 96 and 384 wells, stage checkpoints, deviations, analysis summary, disposition and review.
    What is inside: Run log

    A run log that lets another person reconstruct a run: what was used, who did what, what went wrong and what was decided.

    Sections

    1. Header
    2. Instrument block
    3. Reagent block
    4. DNA block
    5. Plate map, 96 wells
    6. Plate map, 384 wells
    7. Stage checkpoints
    8. Deviations and reworks
    9. Acquisition summary
    10. Analysis summary
    11. Disposition
    12. Sign-off

    Where the structure comes from

    • Published validations describe reserved negative-control wells, reference samples, duplicates, an identity or sex marker and second-person review as typical practice.[4]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML14 KB for Run log, opens in a new tab

    SHA-256 b3522f2b0a9f…

    Free to use inside your own organization; redistribution not permitted.

  • T-04v1checked 24 Nov 2026

    Installation checklist

    Service and installationSite readiness, delivery inspection, serial and inventory record, decontamination status, installation and software records, handover, IQ skeleton and sign-off.
    What is inside: Installation checklist

    A checklist to record installation against your own protocol. Requirements and limits are entered from your manufacturer's documents, not supplied here.

    Sections

    1. Identification
    2. Pre-delivery site readiness
    3. Delivery inspection
    4. Serial and inventory record
    5. Decontamination status
    6. Installation record
    7. Software and configuration record
    8. Handover and training record
    9. IQ record skeleton
    10. Relocation addendum
    11. Decommissioning addendum
    12. Sign-off

    Where the structure comes from

    • We could not find a pre-installation guide or an IQ and OQ protocol in the public pages we checked, so this template leaves those values for your documents.[5]
    • Another vendor's published pattern repeats installation qualification after relocation and after an environment change; see the relocation addendum below.[7]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML10 KB for Installation checklist, opens in a new tab

    SHA-256 1d8fb94556fb…

    Free to use inside your own organization; redistribution not permitted.

  • T-05v1checked 24 Nov 2026

    Preventive-maintenance log

    Service and installationTask table with a blank interval column by design, parts record, verification performed and sign-off. Also a CSV.
    What is inside: Preventive-maintenance log

    A log for planned maintenance. The task and interval columns are blank on purpose: they come from your manufacturer's current guide.

    Sections

    1. Instrument
    2. Task log
    3. Parts replaced
    4. Verification performed
    5. Engineer's report
    6. Sign-off

    Where the structure comes from

    • The manufacturer's warranty names periodic maintenance and calibration among customer responsibilities and excepts laser work.[6]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML6 KB for Preventive-maintenance log, opens in a new tab

    SHA-256 0039b9b19a4a…

    Free to use inside your own organization; redistribution not permitted.

  • T-06v1checked 24 Nov 2026

    Change-control and re-qualification record

    Quality systemEvent, description, impact assessment, the verification and qualification scope decided, owner, sign-offs, evidence and effective date.
    What is inside: Change-control and re-qualification record

    A record for one proposed change. It forces the question 'what do we need to repeat?' to be answered, by a named person, before the change goes live.

    Sections

    1. Change
    2. Event type
    3. Description
    4. Impact assessment
    5. Verification and qualification scope decided
    6. Owner and effective date
    7. Evidence links
    8. Sign-off

    Where the structure comes from

    • Another vendor's public pattern lists which events repeat installation, operational or performance qualification.[7]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML6 KB for Change-control and re-qualification record, opens in a new tab

    SHA-256 baf72a1f6dbb…

    Free to use inside your own organization; redistribution not permitted.

  • T-07v1checked 24 Nov 2026

    Decontamination declaration

    Service and installationEquipment identification, last use, categories of material handled, decontamination performed, residual hazard statement, signature, engineer verification and mismatch hold point.
    What is inside: Decontamination declaration

    A declaration to complete before any visit or return. The engineer then checks it against the visible condition of the unit, and a mismatch stops work.

    Sections

    1. Equipment identification
    2. Last use
    3. Materials handled (categories only)
    4. Exposure question
    5. Decontamination performed
    6. Declaration
    7. Responsibility
    8. Engineer verification
    9. Mismatch or unclear status

    Where the structure comes from

    • The manufacturer's warranty requires written notice of any decontamination before a service visit and a customer representative on site.[8]
    • Other instrument companies ask for a decontamination declaration with some returns; this form follows that general pattern.[15]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML7 KB for Decontamination declaration, opens in a new tab

    SHA-256 b24acbd4b8f5…

    Free to use inside your own organization; redistribution not permitted.

  • T-08v1checked 24 Nov 2026

    Fault report sheet

    Service and installationThe list of what to have ready, the exact on-screen text, a timeline, what changed, actions already taken, photos and the safety-stop check.
    What is inside: Fault report sheet

    A sheet to note exactly what was seen and done when a fault appears, so the person who helps does not have to reconstruct it.

    Sections

    1. Safety stop: tick any that apply, then stop using the instrument and report it
    2. Identification
    3. What was seen
    4. What changed recently
    5. Timeline
    6. Actions already taken
    7. Photos
    8. Manufacturer contact

    Where the structure comes from

    • The manufacturer's warranty asks customers to give written notice before a service visit and to return nothing without its consent.[8]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML6 KB for Fault report sheet, opens in a new tab

    SHA-256 e0e79bc70465…

    Free to use inside your own organization; redistribution not permitted.

  • T-09v1checked 24 Nov 2026

    Site-readiness sheet

    Service and installationA standalone readiness checklist with a power-quality section: what to record and which questions to put to the manufacturer. No values.
    What is inside: Site-readiness sheet

    A sheet to record the readiness of a room against your manufacturer's site-preparation document, including what to record about electrical supply quality.

    Sections

    1. Room and instrument
    2. Readiness areas
    3. Power quality: what to record
    4. Questions to put to the manufacturer, in writing
    5. Sign-off

    Where the structure comes from

    • We could not find a public site-preparation guide in the pages we checked, so every requirement here is entered by you from your own document.[5]
    • Published guidance describes unidirectional workflow and separated areas for molecular work.[2]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML7 KB for Site-readiness sheet, opens in a new tab

    SHA-256 0c6f25ed1fd2…

    Free to use inside your own organization; redistribution not permitted.

  • T-10v1checked 24 Nov 2026

    Qualification evidence index

    Qualification and verificationAn index of qualification evidence: document, location, version, date, reviewer. Also a CSV.
    What is inside: Qualification evidence index

    An index so a reviewer can find each piece of qualification evidence for an instrument in one place.

    Sections

    1. Instrument
    2. Evidence
    3. Further evidence

    Where the structure comes from

    • USP general chapter <1058> frames instrument qualification as design, installation, operational and performance qualification.[9]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML5 KB for Qualification evidence index, opens in a new tab

    SHA-256 f3e177038483…

    Free to use inside your own organization; redistribution not permitted.

  • T-11v1checked 24 Nov 2026

    Service report

    Service and installationA report layout that records what was done and measured and declares nothing about fitness for use.

    A service report records what was done and measured. It is not a declaration that an instrument is validated or fit for clinical use.

    What is inside: Service report

    A service report records what was done and measured, in the customer's words and the engineer's. It gives the customer what they need for their own change control, and the customer decides.

    Sections

    1. Report
    2. Instrument
    3. Decontamination
    4. Reported fault, in the customer's words
    5. Findings and work
    6. Parts replaced
    7. Verification performed
    8. Open items and limitations
    9. Recommendations and customer impact
    10. Attachments
    11. Sign-off
    12. What this report is

    Where the structure comes from

    • The manufacturer's warranty requires a customer representative on site throughout on-site service.[8]
    • Equipment maintenance and function checks are recorded against the manufacturer's stated limits in one example framework.[10]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML6 KB for Service report, opens in a new tab

    SHA-256 864dc5e3fb4a…

    Free to use inside your own organization; redistribution not permitted.

  • T-12v1checked 24 Nov 2026

    Maintenance and troubleshooting procedure

    SOPs and plansDocument control, scope, responsibility matrix, a task table with blank intervals, an escalation table, safety references and records.
    What is inside: Maintenance and troubleshooting procedure

    An outline for your own maintenance and troubleshooting procedure. Tasks, intervals and first checks come from your manufacturer's current guide.

    Sections

    1. Document control
    2. Scope
    3. Responsibility matrix
    4. Task table
    5. Escalation table
    6. Spill and safety references
    7. Records and backup
    8. Revision history

    Where the structure comes from

    • The manufacturer's warranty assigns periodic maintenance and calibration, replacement of named hardware components, data backup, networking and waste disposal to the customer, and excepts laser work.[6]
    • In one example framework a laboratory performs and documents the manufacturer's maintenance and function checks at least as often as the manufacturer specifies.[10]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML8 KB for Maintenance and troubleshooting procedure, opens in a new tab

    SHA-256 1cdb62eadcad…

    Free to use inside your own organization; redistribution not permitted.

  • T-13v1checked 24 Nov 2026

    Training and competency record

    Quality systemTrainee and role, topics, assessment method, assessor, criteria set by your laboratory, outcome and blank re-assessment dates. Also a CSV.
    What is inside: Training and competency record

    A record of who was trained on what, how competency was assessed, and when it is next assessed. Criteria are set by your laboratory.

    Sections

    1. Trainee
    2. Topics and assessment
    3. Sign-off

    Where the structure comes from

    • Customer-side tasks named in the manufacturer's warranty are good candidates for a training topic.[6]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML5 KB for Training and competency record, opens in a new tab

    SHA-256 76f9a43c699e…

    Free to use inside your own organization; redistribution not permitted.

  • T-14v1checked 24 Nov 2026

    Receiving and lot-change record

    Run and lot recordsItem, supplier, lot, expiry and receipt, packaging and storage checks, quarantine, the lot-change check, decision and change link. Also a CSV.
    What is inside: Receiving and lot-change record

    A record for receiving consumables and for the check made when a lot changes. Criteria come from your SOP and the supplier's insert.

    Sections

    1. Receiving record
    2. Lot-change check
    3. Lot-change decisions

    Where the structure comes from

    • Control practice for molecular tests is described in one example framework as at least a positive and a negative control, with more for extraction and amplification.[11]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML6 KB for Receiving and lot-change record, opens in a new tab

    SHA-256 1da9fcb23901…

    Free to use inside your own organization; redistribution not permitted.

  • T-15v1checked 24 Nov 2026

    PC and OS change checklist

    Service and installationCurrent names and versions, the written compatibility statement requested, backup list, rollback plan, verification after the change and the change record link.
    What is inside: PC and OS change checklist

    A checklist for planning, backing up and recording a change to the instrument PC or operating system.

    Sections

    1. Current state
    2. Compatibility statement
    3. Backup list, per your manufacturer's guide
    4. Rollback plan
    5. Verification after the change
    6. Network and security notes
    7. Change record
    8. Sign-off

    Where the structure comes from

    • Backup is a customer responsibility in the manufacturer's warranty.[6]
    • The manufacturer's service-plans page links a brochure titled Windows 10 upgrade; we have not read its contents.[12]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML6 KB for PC and OS change checklist, opens in a new tab

    SHA-256 99559fdffa12…

    Free to use inside your own organization; redistribution not permitted.

  • T-16v1checked 24 Nov 2026

    Performance-verification record

    Qualification and verificationIdentifiers, material used and its source, the metrics your SOP defines, lab-set limits left blank, who ran and who reviewed. Also a CSV for trending.
    What is inside: Performance-verification record

    A record of recurring performance-verification runs. Metrics and limits are entered by your laboratory; none are supplied here.

    Sections

    1. Identification
    2. Runs
    3. Trend review

    Where the structure comes from

    • The manufacturer's service plans name monthly performance-verification kits without defining them.[13]
    • In one example framework, maintenance and function checks must fall within the manufacturer's limits before testing.[10]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML5 KB for Performance-verification record, opens in a new tab

    SHA-256 26890844a053…

    Free to use inside your own organization; redistribution not permitted.

  • T-17v1checked 24 Nov 2026

    Proficiency-testing log

    Quality systemEvent, date, sample identity in your system, expected and reported result, evaluation, corrective action and reviewer. Also a CSV.
    What is inside: Proficiency-testing log

    A log of external assessment rounds, what was reported, how the provider evaluated it, and what was done about any problem.

    Sections

    1. Log

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML4 KB for Proficiency-testing log, opens in a new tab

    SHA-256 107410d36bd5…

    Free to use inside your own organization; redistribution not permitted.

  • T-18v1checked 24 Nov 2026

    Manufacturer-notice register

    Quality systemNotice reference, what it affects, date received, summary in your words, impact assessment, action, verification scope, owner and closure. Also a CSV.
    What is inside: Manufacturer-notice register

    A register of notices received from the manufacturer, who assessed each one and what followed.

    Sections

    1. Register

    Where the structure comes from

    • The manufacturer's support page names a customer portal and regional help desks as routes for existing customers.[14]
    • The layout and prompts are original. No manufacturer document, SOP or form was copied.

    Version history

    • v1, 24 November 2026: First release.

    Print-ready HTML4 KB for Manufacturer-notice register, opens in a new tab

    SHA-256 13a3f2278f3c…

    Free to use inside your own organization; redistribution not permitted.

License and checksums

License and notice

Free to use inside your own organization; redistribution not permitted.

Related: SOPs, Validation.

SHA-256 of each Markdown template file
TemplateTitleFileSHA-256 of the Markdown file
T-01SOP template (assay procedure)t-01-sop-assay-procedure.md546d73c0c20568d2c1cf097b98f23540f527890b55abd0d089ca16a6ad3952b6
T-02Validation plant-02-validation-plan.md5388831bd1c5560f372d8d0d9285355aaef200f16ceeff433580ff599a68e870
T-03Run logt-03-run-log.mdb3522f2b0a9f90d390487fe0d970a0c1192b56388cce3b8dc4b22efe5ea361be
T-04Installation checklistt-04-installation-checklist.md1d8fb94556fbc77b65ba5d889b84c3f4d38d75158ed98c6016c71186ec40bff7
T-05Preventive-maintenance logt-05-preventive-maintenance-log.md0039b9b19a4aec2769b87e7b75107ccee046aacfb1271a5319bdbf8c5174ffca
T-06Change-control and re-qualification recordt-06-change-control-record.mdbaf72a1f6dbbae1f39abb4532dc05ac0e44df3307885f8ee6c131191e15f18b0
T-07Decontamination declarationt-07-decontamination-declaration.mdb24acbd4b8f57a6fedf008f002b5fa087b18aea94438cf4d89f00c2cb7894076
T-08Fault report sheett-08-fault-report-sheet.mde0e79bc704658594b662de17de9fd32324b696a93c1b432139e93c53a24cfb73
T-09Site-readiness sheett-09-site-readiness-sheet.md0c6f25ed1fd2f24377f4259736890b39c31f134f8305d93dd992b33372a10a6b
T-10Qualification evidence indext-10-qualification-evidence-index.mdf3e177038483ffed1b96cf99d43091fa1faa89e1252430495fe1deecb7af9d52
T-11Service reportt-11-service-report.md864dc5e3fb4a8512aee9df6acf3e67b8194e9e3016cdeaa0e658ec5ad9e8aa89
T-12Maintenance and troubleshooting proceduret-12-maintenance-troubleshooting-procedure.md1cdb62eadcadb752898fbc5f9554c9cdee6845eb3ff2f6c76a1281bad1728d14
T-13Training and competency recordt-13-training-competency-record.md76f9a43c699ea331de90da3823b8eed1ed7de42dc3d03cebc82f2b6a82416ddf
T-14Receiving and lot-change recordt-14-receiving-lot-change-record.md1da9fcb239018ee411b7d0649702f5fa02030edfb75c5421120d05c71fd9161a
T-15PC and OS change checklistt-15-pc-os-change-checklist.md99559fdffa12723ff3d8f6b0524690ceca9eec03ebc54531e59b789768c24d90
T-16Performance-verification recordt-16-performance-verification-record.md26890844a053e79093240bc25a3faa07078234a1f3866b42dd5b357da456718b
T-17Proficiency-testing logt-17-proficiency-testing-log.md107410d36bd57c42dc0b4033ff5b79cf4fc2465359567b3091d427458ce05959
T-18Manufacturer-notice registert-18-manufacturer-notice-register.md13a3f2278f3c7daf47c24e4f8ce182ca03789f335e715b6abbe173756ade96b6

General information; not legal, regulatory or clinical advice.

Sources

  1. [1]
    LAB-13

    CLSI MM17 (2nd edition, 31 May 2018) covers validation and verification of qualitative multiplex nucleic acid assays for genotyping and pathogen detection, as good-practice recommendations rather than requirements; CLSI QMS02 (7th edition, 11 March 2024) is a guideline on developing and managing laboratory documents.

    CLSI MM17: Validation and Verification of Multiplex Nucleic Acid Assays; CLSI QMS02 (external)

    Checked on 24 November 2026Third party

  2. [2]
    LAB-19

    APHL guidance on molecular laboratory space recommends unidirectional workflow separating pre-PCR stages, at least three enclosed rooms (reagents; sample preparation and assay setup; PCR and post-amplification) or physical separation using dead-air boxes or PCR workstations, and positive air pressure in reagent rooms. CDC's MMWR says CLIA requires unidirectional workflow with separate areas for specimen preparation, amplification and detection for open amplification systems; closed systems are exempt.

    APHL: Molecular Workflow (newborn screening resources); CDC MMWR Recommendations and Reports 58(RR-6), aphl.org/programs/newborn_screening/Pages/Molecular-Workflow.aspx

    Checked on 24 November 2026Third partymedium confidence

  3. [3]
    LAB-04

    CLIA 42 CFR 493.1253: for an unmodified FDA-cleared test a laboratory verifies accuracy, precision and reportable range and confirms reference intervals; for modified tests and tests not subject to FDA clearance it also establishes analytical sensitivity and specificity (including interfering substances) and any other needed characteristic before reporting patient results.

    42 CFR 493.1253 Standard: Establishment and verification of performance specifications (eCFR) (external)

    Checked on 24 November 2026Regulator

  4. [4]
    DAT-10

    Published validations describe typical QC practice: reserved negative-control wells, reference samples of known genotype, duplicates to check discordance, an identity or sex marker, and second-person review. Acceptance numbers come from each laboratory's own validation; no numeric limit is published as a standard.

    SNPflow quality-control article (PLoS ONE, DOI 10.1371/journal.pone.0059508); Journal of Applied Laboratory Medicine 2020;5(3):454-466 (external)

    Checked on 24 November 2026Peer-reviewedmedium confidence

  5. [5]
    INS-01

    We could not find a pre-installation guide, installation checklist, IQ/OQ protocol, service manual or parts list in the Agena support and resource pages we checked on 24 November 2026; what is there is warranty terms, two service plans and support routes. Physical and electrical figures for the Analyzer 4 appear only in third-party listings.

    Agena Bioscience: Support; Agena Bioscience: Product Literature, agenabio.com/support/

    Checked on 24 November 2026Derivedmedium confidence

  6. [6]
    WAR-03

    The warranty page makes these customer responsibilities: periodic maintenance and calibration, replacing hardware components such as dispense pins, liquid-handler tips and clean resin tools, data backup, networking and waste disposal. Lasers are excepted, so laser replacement is not a customer task.

    Agena Bioscience: System Warranty, agenabio.com/support/system-warranty/

    Checked on 24 November 2026Manufacturer-reportedmedium confidence

  7. [7]
    LAB-17

    Another instrument vendor's public qualification pattern: IQ confirms installation to specification and safety rules, OQ confirms operation within operating specifications, and PQ follows a qualified major repair. IQ is repeated at install, after relocation and reinstallation and after environment change; OQ after reactive service, software upgrade or preventive maintenance.

    Instrument qualification services page (another instrument vendor), Other-vendor public page

    Checked on 24 November 2026Third partymedium confidence

  8. [8]
    WAR-05

    Before a service visit the customer must tell Agena in writing about any decontamination of the system, a customer representative must be on site throughout on-site service, and no product or component may be returned without Agena's prior consent.

    Agena Bioscience: System Warranty, agenabio.com/support/system-warranty/

    Checked on 24 November 2026Manufacturer-reportedmedium confidence

  9. [9]
    LAB-16

    USP general chapter <1058> frames analytical instrument qualification as DQ, IQ, OQ and PQ, with instruments sorted into groups A, B and C; a draft revision renames it Analytical Instrument and System Qualification.

    An Enhanced Approach to Analytical Instrument and System Qualification (Spectroscopy, 1 May 2025), spectroscopyonline.com/an-enhanced-approach-to-analytical-instrument-and-system-qualification

    Checked on 24 November 2026Third partymedium confidence

  10. [10]
    LAB-06

    CLIA 42 CFR 493.1254: for unmodified manufacturer-supported equipment the laboratory performs and documents the manufacturer's maintenance and function checks at least as often as the manufacturer specifies, with results within the manufacturer's limits before patient testing; modified or non-manufacturer equipment needs the laboratory's own written protocols.

    42 CFR 493.1254 Standard: Maintenance and function checks (eCFR) (external)

    Checked on 24 November 2026Regulator

  11. [11]
    LAB-05

    CLIA 42 CFR 493.1256: daily minimum controls are one positive and one negative for qualitative tests, two controls for tests with an extraction step (one able to detect extraction errors), and for molecular amplification two controls plus an inhibition control where inhibition is a significant cause of false negatives.

    42 CFR 493.1256 Standard: Control procedures (eCFR) (external)

    Checked on 24 November 2026Regulator

  12. [12]
    SUP-06

    Agena's service-plans page links three brochures titled Customer Support Solutions, Windows 10 upgrade and Performance Verification Kit. Their contents were not read, so only the titles can be cited.

    Agena Bioscience: Service Plans, agenabio.com/support/service-plans/

    Checked on 24 November 2026Manufacturer-reportedmedium confidence

  13. [13]
    SUP-01

    Agena's service-plan page lists an Essential tier (preventive maintenance, on-site applications support, fast response) and a Plus tier that adds applications training, monthly performance verification kits, next-day response and qualification services. Both cover the system and the Chip Prep Module; no prices, hours or definitions are given.

    Agena Bioscience: Service Plans, agenabio.com/support/service-plans/

    Checked on 24 November 2026Manufacturer-reportedmedium confidence

  14. [14]
    SUP-02

    Agena's support page names a Customer Support Portal for existing customers (complaint logging, online manuals, safety data sheets, product training) and regional help desks for the Americas, Australia/New Zealand, China and Asia Pacific, and Europe.

    Agena Bioscience: Support, agenabio.com/support/

    Checked on 24 November 2026Manufacturer-reportedmedium confidence

  15. [15]
    LAB-18

    Relocation and return patterns at other instrument companies: one describes relocation in four stages (pre-move consultation, insured transport, de-installation and re-installation by engineers, testing and calibration) and is silent on decontamination; another requires a decontamination declaration form with some returns, a reference number, item condition and a detailed fault description.

    How easy is it to relocate a mass spectrometer? (vendor community blog, 1 June 2017); goods-return page (another instrument vendor), Other-vendor public page

    Checked on 24 November 2026Third partymedium confidence